Description
For use with the Ecto Goggles Kit. Package of two 3mm green LEDs.
A 3mm green solid state LED. Reliable and long life – solid state reliability with low power consumption. Made from GaP emitting colour material.
$1.15
49 in stock
For use with the Ecto Goggles Kit. Package of two 3mm green LEDs.
A 3mm green solid state LED. Reliable and long life – solid state reliability with low power consumption. Made from GaP emitting colour material.
| Weight | 0.03 oz |
|---|---|
| Dimensions | 1.34 × 0.24 × 0.12 in |