Long Lead 3mm Green LEDs – Two count

$1.15

50 in stock

Category: Tag:

Description

For use with the Ecto Goggles Kit. Package of two 3mm green LEDs.

A 3mm green solid state LED. Reliable and  long life – solid state reliability with low power consumption. Made from GaP emitting colour material.

Additional information

Weight 0.03 oz
Dimensions 1.34 × 0.24 × 0.12 in